JSC "MINNEFTEGASSTROI"

International Integration Oil And Gas Engineering Company

Investment project MINNEFTEGASSTROI

The construction of the fuel and energy cluster in the South of Russia,

Abinskiy rayon, Krasnodar Krai

 

 

Abinskiy rayon is located in the southern foothill part of Krasnodar territory. Its area is 162,4 thousand hectares. The district is located 35 settlements, which are home to about 90 thousand people.Abinskiy rayon is located 80 km from Krasnodar and 60 km tchernomorska coast, has a well-developed road network with a total length of over 900 km. the District is crossed by a highway Krasnodar-Novorossiysk and Novorossiysk-Moscow. There are two railway stations, long distance bus station.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VASILIEV

Alexander T.

The head of the Abinsk district of the MO

 

 

 

ABINSKIY FUEL-ENERGY CLUSTER

1. Combined-cycle power plant ("CHP GP") capacity of 450 MW;

2. Oil refinery ("refinery Abinskiy");

3. Petrochemical plant ("Abinskiy NHC");

4. Product pipeline with access to the Black sea coast;

5. Cargo terminal with two loading and unloading platforms, made in the Black sea;

6. Objects socially-cultural appointment.

 

THE GOALS AND OBJECTIVES OF THE PROJECT

The project is implemented in accordance with the "Program of development of the fuel base of the North-Caucasian region of Russia and ensure the transport of oil, oil products and liquefied hydrocarbon gases through the ports of the Azov-black sea Basin" and "Energy development strategy of Russia for the period till 2030"

 

ECONOMIC SIGNIFICANCE OF THE PROJECT

(Factors determining the feasibility of implementing)

  • the provision of national economy of the South of Russia petroleum products;

  • competitive advantage, provide new production, built using modern Russian and foreign technologies;

  • the possibility of export deliveries of finished products;

  • reducing toxicity of emissions from vehicles in the settlements due to the transition to the standards of EURO-4 and EURO-5;

  • the increase in industrial potential of the Region;

  • the energy independence of the region;

  • the development of related industries;

  • the creation of new jobs.

 

 GENERAL DESCRIPTION OF THE PROJECT

 

Profitability index (PI) - 1,93

The total discounted payback period (DPBP) - 12 years

Net present value (NPV) - 2 671820 thousand Euro

The total investment for the project - 7 434 million euros

The total investment for the project - 7 434 million euros

Required volume of investments - 3 581 million euros

Internal rate of return (IRR) - 28.1%

The total payback period (PBP) - 8 years

The timing of the project - 2012-2017

The planning horizon - 15 years

 

 

THE PARTICIPANTS OF THE PROJECT

In the orbit project includes a Contracting company best implements the unique experience of construction in Russia, gas & oil systems, stretching more than 200 000 km and resettlement in Siberia of oil and gas deposits of national importance.

Companies are implementing industrial mobile construction in thread-speed mode with use of the complete-block devices at the factory. The widespread introduction of such innovation allows you to program the pace of work and ensure the quality of constructed objects.

 

 

ОАО "МИННЕФТЕГАЗСТРОЙ"

Международная Интеграционная Нефтегазостроительная Компания

107140, Россия, Москва,  

ул.Русаковская 13, офис № 417

+7 (495) 603-09-73

+7 (495) 603-33-38

© 2005 JSC «MINNEFTEGASSTROI»